Lenox Locker Installation instructions


Step 1: Optional Locker Base Installation
IMPORTANT: Make sure the base is square AND level before anchoring to the floor (the
base may be square but not level so be sure to check both). This will ensure proper locker
operation.
NOTE: The base sections are shipped in standard lengths and come with slotted end caps. The length
of the base sections can be easily modified during installation by cutting one end to the desired
length. DO NOT cut the end caps.
1. Measure and scribe placement lines for the locker base sections.
2. Position the base sections per submittal layout. The ends of the base sections fit into the slots in
the end caps (see Figure 1). Square and plumb the sections and end caps using shims as required.
If shims are used, place them under the mounting brackets perpendicular to the bracket.
3. For longer locker runs, the base sections may need to be connected together. Use the mending
plate and #10 x 1/2" screws provided to connect pieces (see inset, Figure 1).
4. Using the applicable mounting hardware supplied, anchor the base sections to the floor. Use a
3/16" masonry drill bit for 1/4 x 1-3/4" Tapcon screws (see inset, Figure 1).

Step 2: Optional Corner Filler Installation
NOTE: Corner fillers are designed to fill gaps in corners (a corner filler is shown in Figure 3a on
page 6). They are attached to the locker with the #10-24 male and #10-24 x 1/2" female sex bolts
provided.
NOTE: Be sure to attach the filler to the proper side of the locker per your submittal layout.
1. Align the filler to the locker top and front and temporarily clamp in place.
2. Using the holes in the filler as a template, drill four 9/32" dia. holes through the locker as shown
in Figure 2.
3. Secure the filler to the locker with the #10-24 male and #10-24 x 1/2" female sex bolts provided.

Step 3: Locker Installation
NOTE: Refer to your submittal layouts for proper locker position. The first locker is usually installed
at a corner or at the end of a run.
IMPORTANT NOTE FOR STANDARD LOCKERS: Make sure each locker is square AND level
before securing into place (the lockers may be square but not level so be sure to check
both). Use shims as needed.
1. Position the first locker according to your submittal layouts. Square and plumb the locker using
shims as required. Secure the locker to the wall in two places with the two 1/4" x 1-3/4" Lg.
Tapcon screws. With the screws centered across the width of the locker, place one near the top
and one near the bottom as shown in Figure 3.
2. Position the second locker next to the first locker. STANDARD LOCKERS ONLY: Square and
plumb the locker using shims (as required) to align the tops and fronts.
IMPORTANT: Lockers must be installed flush with adjacent lockers.
3. Temporarily clamp the lockers together at the top and bottom. Drill four 9/32" clearance holes
through locker as shown in Figure 3. The holes should be located 1-1/2" from the front of the
locker and evenly spaced, top to bottom. Fasten lockers to each other using the #10-24 male and
#10-24 x 3/4" female sex bolts provided.
4. Position additional lockers according to your submittal layouts. Square and plumb each locker
using shims as required. Fasten lockers to each other using the #10-24 male and #10-24 x 3/4"
female sex bolts provided.
5. Secure each locker to the wall in two places with the appropriate wall installation hardware
provided. Use two 1/4" x 1-3/4" Lg. Tapcon screws, placing one near the top and one near the
bottom of the locker

Step 4: Corner Locker Installation
1. Drill four 3/16" dia. clearance holes 1-1/2" from the locker face through the locker box only (see
Figure 4). Fasten the locker to the corner filler with the #6 x 1-1/2" screws provided.
2. Secure each locker to the wall in two places with two 1/4" x 1-3/4" Lg. Tapcon screws, placing
one near the top and one near the bottom of the locker (refer to Figure 3 on page 6).
3. Position the additional lockers according to the submittal layouts. Square and plumb each locker
using shims as required. Fasten the lockers to each other using the #10 x 3/4" T-25 security
screws provided.
4. Secure each locker to the wall in two places with two 1/4" x 1-3/4" Lg. Tapcon screws, placing
one near the top and one near the bottom of the locker (see Figure 3 on page 6).

Attachments:   03/23/2008: lk-instr-001.pdf


Was this article helpful?

Comments:
 

Related Articles
 > Installation Instruction for Bradmar Partitions
 > INSTALLATION INSTRUCTIONS FOR BOBRICK LAMINATED PLASTIC TOILET PARTITIONS 1030 TrimLine™ Series • 1040 Designer™ Series • 1840 FRP™ Series
 > INSTALLATION INSTRUCTIONS solid phenolic TOILET partitions 1080 DuraLineSeries™ • 1180 DuraLineSeries™ Class-A Fire Rated
 > INSTALLATION INSTRUCTIONS 1090 SIERRA™ SERIES TOILET PARTITIONS WITH HEAVY-DUTY HARDWARE
 > INSTALLATION INSTRUCTIONS LAMINATED PLASTIC TOILET partitions 1540 ClassicSeries™ with Options
 > Bradley Lenox Pedestal Bench Installation
 > Bradley Lenox Locker Bench Installation
 > Bradley Panelon Shower system installation Instructions
 > Bradley Column shower Installation Instructions
 > Bradley Column beach Shower COL-5C-HN, COL-4C-HN, COL-3C-HN, COL-2C-HN Installation
 > Bradley Column beach Shower COL-5C-HN, COL-4C-HN, COL-3C-HN, COL-2C-HN
 > Bradley Adapt-A-Brad Conversion instructions
 > Installation Instructions for Bradley 1W (Bradsole), 2W, 3W, 1K & 1F Econo-Wall™ Showers
 > Bradley WS-2WMD Dual Station Wall saver Shower (Multi Stall ) Stainless Steel,Bradley WS-3WMT Three Station Wall Saver Shower installation instructi